Nancome 26kwh off-Grid Charging Solution with Renewable Energy and Smart Monitoring

Still deciding? Get samples of $ !
Order Sample

Product Description

● Basic Information
Model NO.NCBCS01
LocationPublic Use
Charging InterfacesOne Pile with One Charge
Start ModeCredit Card, Mobile Remote, RFID
Storage Energy26-200kwh LiFePO4
Output Power20kw-180kw Constant Power
Output VoltageDC200V-1000V
Working Temperature-10°C~+60°C
IP GradeIP54
Charging GunGB/T, CCS1, CCS2, Chademo Optional
High Performance Solution: Off-Grid charging solution integrated with renewable energy and smart monitoring for public and commercial use.
● Product Description
Off-Grid Charging Solution 1
Off-Grid Charging Solution 2
Off-Grid Charging Solution 3
● Technical Specification
Specification Detail 1
Specification Detail 2
● Packaging & Delivery
Package Size260.00cm * 135.00cm * 160.00cm
Package Gross Weight2800.000kg
Transport Package1PCS/Wooden Box
● Frequently Asked Questions
1. Are the charging ports compatible with vehicles in different countries? Yes, our chargers support multiple standards including CCS1, CCS2, GB/T, and CHAdeMO to ensure global compatibility with most mainstream EVs.
2. Can the system operate in extreme weather conditions? Absolutely. Our devices are tested for temperatures ranging from -20°C to 55°C and are built with IP54/IP65 protection levels, making them suitable for high-humidity and dusty environments.
3. How does the system respond to grid instability or power outages? The system is equipped with LiFePO4 energy storage and can integrate with diesel backup. It automatically switches power sources during outages to ensure continuous operation.
4. Can the system be remotely monitored? Yes, we provide cloud-based platform support which enables real-time monitoring, remote diagnostics, and instant alerts for the entire charging and storage system.
5. What is the expected service life of these systems? The overall system lifespan is approximately 8–10 years. The storage batteries are high-quality LiFePO4, supporting over 3000+ cycles with long maintenance intervals.
6. Is a professional installation required for mobile units? While floor-mounted chargers require basic wiring, our mobile energy storage units are designed for plug-and-play use and typically require no major civil work.

Related Products